Floor Care

  • Morring

    In the morning, a ray of light leaps into your snail house, a touch of white light opens your night

    Stepping barefoot on the cool floor, holding a cup of slightly bitter coffee

    Enjoy the beginning of the day

    Shaking the coffee cup, the brown liquid swayed and fell to the floor

    The corners of your mouth are slightly raised, pick up the rag, and kneel on the floor to wipe off the stains

    The fingertips lightly touch the wooden annual rings on the floor, the natural texture and the precipitated color, instantly bring you a day of calm and appropriateness

  • Night

    At night, the hustle and bustle of the city begins to let go slowly, and the mottled night scene lightly shakes your eyes

    You want to lie on your back on the floor and relax in the quiet living room

    Release the tiredness of the day

    Unfold the yoga mat and slowly spread the curled mat on the floor

    Quietly cross your legs, stretch your body lightly, and the stretched shadow is reflected on the floor

    Get up and put away the yoga mat and place it aside, squatting on the floor along the floor-to-ceiling windows, watching the sultry night outside the window

  • After laying the floor, the concave tiles are deformed. What is the reason?

    The discoloration of wood is mainly caused by the absorption of ultraviolet light. The sapwood and heartwood of the wood have different discoloration after absorbing the ultraviolet light, which will cause a certain color difference in the paved floor. The surface layer of the multi-layer solid wood composite floor is natural wood, which has wood The natural properties of the product, the resulting light discoloration is a normal phenomenon, and is not a product quality problem. It can be used for sun protection and replacement of partial floors.

    In addition, there are discoloration caused by external factors. The main reason is that the color of the floor is darkened and the color of the wood is darkened. The moisture source can be cut off and the floor can be removed, and the floor can be dried. The floor will also be discolored. Power appliances to avoid direct fire to the floor.


  • Common floor care knowledge

    Avoid sun exposure to the floor to avoid premature aging and cracking of the paint under sunlight; also do not use hot and cold air to blow or bake the floor directly. The painted floor should not be used for a long time. Do not cover it with plastic cloth or newspaper to prevent the paint film from sticking and losing its luster for a long time. At the same time, do not directly touch the floor with hot water basins, hot rice cookers and other high-temperature objects to avoid scalding damage. Lacquer film. Part of the board surface accidentally stained with oil should be cleaned up in time. If there are oil stains, use a rag or mop with a small amount of warm water to wipe, or use neutral soapy water and a little detergent to wipe.

    If it is medicine, paint or beverage, it must be wiped with a soft cloth dipped in furniture wax before the stain has penetrated into the board surface. During the use of the floor, if the floor is found to be warped or peeled off, the floor should be removed in time, the old glue and dust should be removed, and new glue should be applied for compaction; if the paint film of the individual floor is damaged or white, it can be polished with water sandpaper dipped in soapy water , And then wipe it clean. After drying, perform partial color correction. After the color is dry, apply a coat of paint. After 24 hours, polish it with water sandpaper, and then polish with wax.


Service Process

  • Design Program

    Construction organization design program

  • Construction Preparation

    Construction standards and specifications

  • Schedule

    Develop specific project schedule

  • Management And Measures

    On-site organization and management and measures

  • Quality Control

    Engineering quality control and supervision measures

Service Commitment

  • 01

    Reserve an inventory of 2% of the total actual engineering supply of the project,
    As a spare floor after the floor sale,
    To ensure that the floor lot, color, and quality are consistent with the bulk.

  • 02

    Set up a dedicated project after-sales service department,
    A designated person will answer customer calls 24 hours a day, 7 days a week,
    Make sure to arrive at the repair site within 48 hours.

  • 03

    Any quality problems occur during the warranty period,
    Our company will be in a highly responsible spirit,
    Solve the quality problems that may actually occur with the highest work efficiency in the first time, and eliminate any inconvenience to customers.

Complaints & Suggestions